Herold Industrial Park

A renovated 21,500 ft² building and a new 18,800 ft² mass timber building on a constrained site between two highways.

Sudbury, Ontario Completed 2020–2025
Warehouse interior under an exposed glulam roof structure, with equipment and storage racks
Photo Amanda Thirkill.

This project combined a renovation and a new building on a site tightly constrained by two major highways and flood-plain conservation requirements. The existing building received new cladding and roofing. The new building was designed in mass timber, following its success at the sister project, Cambrian Heights.

A tenant fit-up ran in parallel with interior base-building construction, which added coordination between the two scopes. Flexibility for future users was planned from the start, with an enlarged mezzanine and a new front entrance structure. The mass timber stays exposed throughout, in the offices as well as the warehouse.

Status
Completed
Period
2020–2025
Location
Sudbury, Ontario
Sector
Industrial
Structure
Mass timber (new); pre-engineered steel (existing)
Scale
2 storeys (both buildings)
Floor area
18,800 ft² new; 21,500 ft² existing
Client
Bloomington Developments
DAO services
  • Record drawings
  • Authority having jurisdiction (AHJ) compliance
  • Master planning
  • Site plan approval
  • Landscape design
  • Conceptual design
  • Rendering package
  • Building permit
  • Tenant fit-up (partial)
  • Phased work
  • Enhanced construction administration

Project team and credits

  • Mass timberNordic
  • StructuralTall Pines Engineering
  • Site structuralEnglobe
  • Mechanical and electricalSNC
  • CivilTulloch Engineering
  • GeotechnicalTerraprobe
  • CodeCHM
  • Tenant base buildingDAO, Makami, Nordic, SNC
  • Tenant fit-upJLR
  • Interior photographyAmanda Thirkill
Start a conversation