Headquarters

A second-storey office cantilevered in two directions over an existing warehouse, with rooftop equipment hidden in a new roof form.

Sudbury, Ontario Design (not built) 2022
Rendering of a dark two-storey office addition over a warehouse frontage

Adding a second-storey office over an existing warehouse was the challenge. The addition would cantilever over the structure in two directions, and rooftop access and mechanical equipment were to be hidden inside a new roof form. The warehouse's existing fins were carried up into the new façade to join old and new.

The project did not proceed to construction. The renovation strategies developed here carry into later work.

Status
Design (not built)
Period
2022
Location
Sudbury, Ontario
Sector
Commercial
Structure
Wood
Scale
2 storeys + existing
Client
Bloomington Developments
DAO services
  • Record drawings
  • Site plan approval
  • Conceptual design
  • Rendering package
  • Building permit

Project team and credits

  • StructuralKomri Engineering
  • Mechanical and electricalSNC
Start a conversation

Have a site, a building or an idea? Tell us about it.

Email connect@p-dao.com. We work from Sudbury and Ottawa across Ontario.